Rainwater Treatment, Maintenance of Drainage and Sewer Systems

Module name (EN):
Name of module in study programme. It should be precise and clear.
Rainwater Treatment, Maintenance of Drainage and Sewer Systems
Degree programme:
Study Programme with validity of corresponding study regulations containing this module.
Civil and structural engineering, Master, ASPO 01.04.2012
Module code: BIMA340
SAP-Submodule-No.:
The exam administration creates a SAP-Submodule-No for every exam type in every module. The SAP-Submodule-No is equal for the same module in different study programs.
P110-0113
Hours per semester week / Teaching method:
The count of hours per week is a combination of lecture (V for German Vorlesung), exercise (U for Übung), practice (P) oder project (PA). For example a course of the form 2V+2U has 2 hours of lecture and 2 hours of exercise per week.
4VU (4 hours per week)
ECTS credits:
European Credit Transfer System. Points for successful completion of a course. Each ECTS point represents a workload of 30 hours.
6
Semester: 3
Mandatory course: no
Language of instruction:
German
Assessment:
Written exam

[updated 28.09.2020]
Applicability / Curricular relevance:
All study programs (with year of the version of study regulations) containing the course.

BIMA340 (P110-0113) Civil and structural engineering, Master, ASPO 01.04.2012 , semester 3, optional course
BIMA340 (P110-0113) Civil and structural engineering, Master, ASPO 01.04.2015 , semester 3, optional course
BIMA340 (P110-0113) Civil and structural engineering, Master, ASPO 01.10.2017 , semester 3, optional course
DFMCE-165 (P630-0132) Civil Engineering, Master, ASPO 01.10.2019 , semester 1, mandatory course
Workload:
Workload of student for successfully completing the course. Each ECTS credit represents 30 working hours. These are the combined effort of face-to-face time, post-processing the subject of the lecture, exercises and preparation for the exam.

The total workload is distributed on the semester (01.04.-30.09. during the summer term, 01.10.-31.03. during the winter term).
60 class hours (= 45 clock hours) over a 15-week period.
The total student study time is 180 hours (equivalent to 6 ECTS credits).
There are therefore 135 hours available for class preparation and follow-up work and exam preparation.
Recommended prerequisites (modules):
None.
Recommended as prerequisite for:
Module coordinator:
Prof. Dr.-Ing. Joachim Dettmar
Lecturer:
Prof. Dr.-Ing. Joachim Dettmar


[updated 25.05.2011]
Learning outcomes:
After successfully completing this module, students will:
_ recognize and understand the connection between wastewater disposal, flood and environmental protection based on lectures on wastewater treatment (Bachelor).
_ understand how important integral and interdisciplinary task processing is.
_ understand complex physical and hydraulic interrelationships and methods and can thus develop economically and ecologically optimized planning concepts for the construction, operation and maintenance of sewage systems and integrated special structures.
_ be able to apply scientific methods and scientific findings to solving new problems, as well as processing practice-oriented tasks.


[updated 28.09.2020]
Module content:
_ Hydrological and hydrodynamic methods and models for sewer network and pollution load calculation;
_ Methods for limiting the input of pollutants in water;
_ Methods for preserving/optimizing the hydraulic performance and structural maintenance of sewer systems.


[updated 28.09.2020]
Recommended or required reading:
_ DWA rules and regulations: Worksheets: A110, A118, A128, A166, Information sheets: M176, M143, M149
_ DWA-Handbuch zur Abwasserableitung (Bauhaus-Universität Weimar)
_ Schröder: Hydraulische Methoden zur Erfassung von Rauheiten (DVWK-Schriftenreihe)
_ Hager: Fließformeln für turbulente Strömungen
_ Althaus: Vergleich von Modellregen zur Kanalnetzberechnung (Institut Hydr. TU Hannover)
_ Euler u. a.: Die Berechnung des Schmutzfrachtabflusses aus Niederschlägen


[updated 28.09.2020]